皇冠博彩app
热门标签

Telegram群组导航(www.tg888.vip):More development projects in Sarawak

时间:2周前   阅读:2   评论:2

erc20和trc20转换www.u2u.it)是最高效的erc20和trc20转换的平台.ERC20 USDT换TRC20 USDT,TRC20 USDT换ERC20 USDT链上匿名完成,手续费低。

Sarawak Premier Tan Sri Abang Johari Tun Openg (second left) looking through a coffee table book in conjunction with the Sarawak Economic Development Corporation's 50th anniversary celebration on Monday (July 4)(File pic)

PETALING JAYA: The prospects of the construction sector remains bright in Sarawak following more development projects in the pipeline, says MIDF Research.

The state government is projecting a capital injection of RM100bil by 2028 in its efforts to achieve a developed economy status.

“About RM64bil will come from the state’s annual budget, while the state’s energy development company Sarawak Energy Bhd is expected to pump in about RM40bil up to 2026,” said the research house in its note to clients.

This is a conservative estimate by Sarawak as the state’s budget averages about RM10bil annually, said MIDF Research.

In addition, investments that would involve several billion ringgit from Japan-based Sumitomo Corp and South Korea-based Samsung in the state’s first hydrogen plant, are expected to begin construction this year, said the research house.

Sarawak is also focusing to look into “sick projects” that were delayed or abandoned.

MIDF Research said this would mean more infrastructure works are expected to be rolled out in the state.

“About 84 sick projects have been identified in Sarawak and among action plans to tackle them are to appoint rescue contractors.

,

Telegram群组导航www.tg888.vip)是一个Telegram群组分享平台,飞机群组内容包括telegram群组索引、Telegram群组导航、新加坡telegram群组、telegram中文群组、telegram群组(其他)、Telegram 美国 群组、telegram群组爬虫、电报群 科学上网、小飞机 怎么 加 群、tg群等内容,为广大电报用户提供各种电报群组/电报频道/电报机器人导航服务。

,

“This could suggest that a number of projects would be retendered – a good opportunity for construction players to replenish their order books,” said the research house.

At the same time, Sarawak remained committed to reimplement projects shelved in 2018.

The research house said tenders for the state-funded second trunk road, which spans 225km, are expected to be called this year, with seven work packages.

“There will be seven more packages next year,” it said, adding that the entire project is estimated at RM5.84bil.

Another closely watched plan is the post Covid-19 development strategy where Sarawak has committed RM63bil for various efforts such as to develop basic infrastructure, namely roads and bridges, water and electricity supply, and telecommunication network.

In June, the state government had said that 7,530km of new roads would be built to connect all rural areas, while 3,487km of roads must be upgraded or rehabilitated.

“This would translate into strong job flows over the long term,” said MIDF Research.

On Tuesday, Sarawak premier Tan Sri Abang Johari Tun Openg said the state government is finalising a programme to assist construction players, which will focus on the prices of raw materials.

“While this is not a massive headwind for most of the companies under our coverage, this is a much-welcomed move for the industry in mitigating the downside risks,” the research house noted.

上一篇:欧博官网会员登录:PAC chair tells Zahid \u2018national security\u2019 no excuse to cover up LCS scandal

下一篇:Malaysia’s ability to increase debt level limited

网友评论

  • 2022-11-02 00:33:40

    统计局局长杨名就称,统计局一直留意大数据在统计应用的发展,国际上使用大数据进行官方统计仍处于摸索阶段,能应用的范围及手段都有限,联合国统计司成立了大数据应用工作小组,对部分国家的官方数据进行大数据试行计划,统计局会密切留意相关试行计划进度及结果,研究适合本澳情况的个案,通过大数据应用,优化统计资料收集模式,发掘过去不可能编制的新指标。另外,统计局近期招聘了一批新的人员,由资深统计员带新进人员进行调查项目。至于与内地统计制度衔接,涉及三方面,包括采集周期、统计标准及GDP计算,如内地以收入法计算GDP,本澳则以支出法计算,需要将两种方法的数据及概念作衔接。(编辑:杨瑞盈)怎么这么好看